Slide 25: Delivery of Precision EQ®

Access road was too steep to get 40’ bulk dump trucks down to the arena. Two 40’ flat beds delivered the Precision EQ rubber footing in 44 one ton “super sacks” which were easily transported by forklift. It took an entire day to make the 44 trips.